26th February 2011

The second stage of the work was to get all of the frames in place which will hold the plywood sound control panels in place. All of the four frames were completed today and we even had time to position the camera for viewing the bells from downstairs. Probably the most tedious job of the day was painting 20 plywood panels, thanks Barry!